Design Standards
Missouri State University's Design Standards are guidelines established to provide a consistent approach to designing and constructing buildings on campus. These standards are developed to assist consultants in understanding the University's policies, the minimum design and submittal criteria, and some of the basic requirements for material and products to be included in University projects. The information within these standards is not specific to any one project, but is common to all projects.
These standards must be adjusted as necessary to meet specific project needs and should be utilized as a baseline of quality. Any deviations should be discussed with the Project Manager and will be reviewed for conformance.
You need Adobe Reader to view and print the following documents.
-
Construction Requirement Date Posted Standard Cover Sheet
Contact MSU Project Manager for the appropriate University Title Blocks
04/27/21 -
Construction Requirement Date Posted Construction Fencing Screen Material 01/06/23 Construction Waste Management 09/21/21 Quality Control 03/28/22 Tree Preservation and Protection 07/20/23 -
Construction Requirement Date Posted Division 3 Concrete Standards 07/09/09 Plaza Wall / Bench 07/15/08 -
Construction Requirement Date Posted Typical Wall Handrail 07/15/08 -
Construction Requirement Date Posted NRCA-BUR-11S Equipment Storage Stand and Typical Rain Collar Penetration Detail in Built-up Roof 07/15/08 NRCA BUR-16S Sheet Metal Enclosure for Piping through Roof Deck 07/15/08 NRCA MB-1 Metal Parapet Cap Flashing 07/16/08 NRCA MB-4 Surface Mount Counter Flashing 07/15/08 NRCA MB-11 Equipment Support Stand and Typical Rain collar Penetration Detail 07/15/08 NRCA MB-12 Raised Curb Detail for Rooftop Air Handling Units and Ducts 07/15/08 NRCA MB-16 Plumbing Vent 07/15/08 NRCA MB-17A Isolated Stack Flashing 07/15/08 NRCA MB-19 Penetration Pocket 07/15/08 NRCA MB-22 Gutter 07/15/08 -
Construction Requirement Date Posted Door Hardware 06/05/23 Door Opener Pedestals 07/15/08 Pedestal Footings 07/15/08 -
Construction Requirement Date Posted Acoustical Panel Ceilings 01/19/24 Missouri State University Maroon 03/15/11 Interior Paint 11/09/23 -
Construction Requirement Date Posted Chair Rail 05/28/09 Device Mounting Heights 11/04/20 Dry Marker Board 11/02/11 Exterior Signage 08/29/14 Fire Extinguisher Cabinets 11/10/23 Non-Illuminated Interior Display System 05/21/15 Toilet Accessories 11/09/23 Typical Interior Signage 05/21/15 Typical ADA Sign Post Installation 11/12/12 Typical Interior Signage Locations 02/11/14 Typical Parking Entrance Sign Post Installation 11/12/12 -
Construction Requirement Date Posted Parking Meters 11/25/08 -
Construction Requirement Date Posted Bench
Contact MSU Project Manager for Bench Details
08/11/21 Bike Rack Detail
Contact MSU Project Manager for Bike Rack Details
04/27/21 Bike Rack Pad 08/15/08 Bike Rack Pad Detail 03/16/12 Entrance Mats 08/01/08 Entrance Mat Standards
Contact MSU Project Manager for Accepted Manufacturers and Product Information.
08/11/21 Outdoor Table with Seats
Contact MSU Project Manager for Outdoor Table with Seats Details
08/11/21 Trash Receptacle 06/25/08 Trash/Recycling Standard 12/07/16 Trellis
Contact MSU Project Manger for Bike Trellis Details
04/27/21 Vertical Louver Blinds 07/07/18 Window Shades 06/30/09 -
Construction Requirement Date Posted HVAC, Plumbing and Fire Protection Identification 11/11/24 -
Construction Requirement Date Posted HVAC, Plumbing and Fire Protection Identification 11/11/24 HVAC and Plumbing Standards 06/01/18 -
Construction Requirement Date Posted Building Control & Facility Management System 05/22/12 HVAC and Plumbing Standards 06/01/18 HVAC, Plumbing and Fire Protection Identification 11/11/24 Underground Hydronic Piping 01/12/23 -
Construction Requirement Date Posted Conduit Embedment 07/15/08 Division 26 Electrical Standards 01/30/07 Electrical Equipment Identification 04/30/14 Exterior Lighting 06/01/18 Floodlight Detail 07/15/08 Light Pole Base - Large 07/16/08 Light Pole Base - Small 07/16/08 Typical Light Detail 05/23/14 -
Construction Requirement Date Posted Classroom Instructional Technology 05/31/23 Networking and Telecommunications Standards 05/07/14 Wireless Clock Systems 01/19/24 -
Construction Requirement Date Posted Card Access Rough-In 07/15/08 -
Construction Requirement Date Posted ADA Accessible Parking 07/22/08 Curb and Gutter 07/15/08 Detectable Warning Paver 07/21/23 Landscape Establishment 06/25/08 Lawns and Grasses 03/12/21 Non-removable Bollard 07/15/08 Removable Bollard - Existing Pavement 07/15/08 Removable Bollard - Concrete 07/15/08 Shrub Planting Detail 11/06/08 Sidewalk Details 07/15/08 Sodded Turf Installation 06/25/08 Standard Tree Planting Detail 11/06/08 Tree Planting Detail for Compacted Soils 11/06/08 Trees, Shrubs and Groundcovers 06/25/08 Typical Bikeway Section and Plan 07/15/08 -
Construction Requirement Date Posted Typical Cleanout Riser 11/04/20 -
Construction Requirement Date Posted Classroom Space Utilization Guidelines 1/19/24 Typical Office Layouts 12/11/14 Typical Office Electrical/Data Layout 09/30/16 Typical Conference Room Layout Guidelines 07/20/07 -
Date Posted ADA
For the latest requirements with respect to the Americans with Disabilities Act and its associated Standards for Accessible Design, please visit:
2010 ADA Standards for Accessible Design
or other websites maintained by the Depatment of Justice.
12/20/10