FY22 Completed Projects
-
Project Description: Construction of a new 16,500 square foot building for the Springfield Public Schools Agricultural Magnet School.
- Consultant: Arkifex Studios
- General Contractor: Larry Snyder & Co.
- Project Budget: $6,700,000.00
- Completion Date: April 18, 2022
-
Project Description: The gymnasium floor will be replaced at the three basketball courts within Foster Recreation Center. The project includes removal of the existing maple floor, prepping existing plywood sub-floor, installation of the new factory sanded maple floor, striping/finishing and installation of new vent cove base.
- Consultant: Planning Design and Construction
- General Contractor: Kenmar Construction
- Project Budget: $358,000.00
- Completion Date: August 13, 2021
-
Project Description: Renovation of rooms 118 & 119 in Glass Hall. Room 117 is currently finished, but will receive new data, LED display, and glass whiteboards. Rooms 118 & 119 are currently shell space that are to be finished comparable to the recent Glass Hall Renovation and Addition projects. This will include the installation and finish of walls, aluminum framed glass windows, millwork, carpet tile, ceiling grid/tile, lighting, outlets, data, LED displays with controls, glass whiteboards, and new furniture.
- Consultant: Planning Design and Construction
- General Contractor: Friga Construction Co., Inc.
- Project Budget: $270,000.00
- Completion Date: April 1, 2022
-
Project Description: This project will renovate approximately 10,800 square feet on the first floor of the Student Union in order to relocate the Office of Student Engagement (OSE) and combine the current Multicultural Resource Center (MRC) and Annex into one new space. The OSE will be relocated to the east end of the game center, where the current bowling lanes are located, and the MRC will be located in the existing OSE space.
- Consultant: Dake | Wells Architecture
- General Contractor: BP Builders, LLC
- Project Budget: $2,100,000.00
- Completion Date: August 16, 2021 for MRC portion, September 23, 2021 for OSE portion
-
Project Description: This project consists of repairs / replacement of utility tunnel structure at tunnel sections 6B, 6C and 6D. The repairs / replacement is primarily related to the tunnel lid but also include temporarily relocating existing electrical lighting and reinstallation. There may also be some removal of abandoned conduits. The tunnel sections start at Woods House on the sidewalk and continue west towards Magers Health and Wellness. The tunnel also crosses under Bear Boulevard. The approximate distance is 300 linear feet.
- Consultant: J&M Engineering, LLC
- General Contractor: Carson-Mitchell, Inc.
- Project Budget: $600,000.00
- Completion Date: July 30, 2021