Replacement of Boiler No. 4, Power House

Consultant:

William Tao and Associates


General Contractor:

WMC Mechanical, Inc.


Project Budget:

$1,480,000.00


Completion Date:

November 2012


Project Description:

This project replaced one of the existing failed boilers located within the Power House. Boiler #4, a 45,000 pound per hour, D type, water tube boiler had multiple failure points making replacement necessary. The replacement bolier9s0 consists of smaller fire tube boilers that are closely matched to the campus summer steam production needs. This project also replaced the existing chimney with a new ground supported unit designed to match the new boiler(s) configuration.